[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: living machines



>> reedbed is 8 square meters surface area (2m per person) and deals with 
>> approx 150-200 litres of waste water per day. 
>
>flow-through is horizontally or vertically?
>if horizontally - how is it lined?

The bed containers are constructed with cement - beds are 50cm deep 
>
>
>> through the reed beds (40 square meters surface area) then the treated 
>
>well, i assume that is horizontal. again: how is it lined?
same as above
>
>> series of 8 flowforms - gets pumped for about 3 hours a day through the 
>
>how do you fuel the pump?
an electric pump
>