The Students will be required to complete this assignment and submit it for grading by February 29th 2000
All assignments must comply with the following specifications
Good-Fair-Poor
The Drawing
.............. The students should submit a 3D view
and a plan view
...............Two copies of each views should be printed
out and put in the students folder
...............The students name must be printed (by
the computer) and should appear on both ducuments.
...............All measurements must show.
...............All measurements must be accurate.
...............Line color should conform with the specifications
given in the assignment.
...............Fillet radius must be accurate and labled
...............Lines should be complete and all lines
must meet at corners
...............The finished project should fill the printed
page with no cropping
In addition the student will be graded based on the accuracy of their measurements and the efficiency of their drawing
............... The students demonstrate mastery of the
use of the Micrometer by taking accurate measurements.
............... The circular holes on the curtain rod
bracket are rotated perpendicular to the plane
............... The legal pad with all the students notes
and measurements is submitted for grading.
............... All measurements are correct.
.............. The three views of the curtain rod
holder are lined up to make maximum use of the guides.
Grade and Comments